You asked three contractors to price the same house and got three numbers with a wide spread and almost nothing else in common. The instinct is to decide the high bid is…
You asked three contractors to price the same house and got three numbers with a wide spread and almost nothing else in common. The instinct is to decide the high bid is padded or the low bid is a find. Usually neither is true. The spread exists because you are holding three descriptions of three different amounts of work, all filed under the same job title. Painting is unusual that way. In most trades the scope is anchored to a physical thing being installed, so the bids converge. Here the scope is almost entirely hours, and hours are invisible on a page.
A painting quote is a scope document that happens to have a price on it. The price is the only part that compares cleanly, which is exactly why it takes over the decision. If you want the comparison to mean anything, you have to make the scopes line up first, and that costs about fifteen minutes of asking everyone the same questions. Fifteen minutes now, or a repaint years earlier than you planned. It is not a close call, but it does require you to be the one who asks, because nobody volunteers a longer scope than the competition.
Start at the top of each quote and look for preparation. Not the word prep by itself, the actual verbs: washing, scraping, sanding, caulking, patching, priming. A quote that describes what happens to the surfaces before color goes on is telling you where its hours went. A quote that jumps straight to product and color has left the biggest part of the job undescribed. Prep is measured in hours, and hours are the price, so a quote that says nothing about preparation is saying nothing about most of its own number.
Absence is not proof of anything, and plenty of good painters write short estimates. But it is worth one direct question in writing, because this is where the money is. Ask what gets washed, what gets scraped, what gets primed, and what happens where the old finish has already failed. If two bidders answer that very differently, you have located your price gap. You are not testing anybody or being difficult. You are making sure three quotes are answering the same question about the same house before you compare them on a single line.
Then look for the coat count. It is remarkable how often the number is simply missing. Apply paint to all walls can honestly mean one coat, and one coat over a sound primed surface is a legitimate approach in some situations, while one coat over failing exterior paint is not an approach at all. Coats also interact with everything above them. Two coats over a chalky, unwashed wall is still two coats bonded to loose powder, so the number only starts to mean something once the prep answer is in hand.
Two coats over proper prep and one coat over none look identical the day the crew loads the truck. They separate later, and they separate first in the places you look at most. Ask every bidder for the number in writing. If the answer is as many as it takes to look right, that is a fine answer too, as long as it is written down where you can point at it. Nobody minds writing it down. This is the sort of detail that goes missing purely because it never got asked about in the first place.
Scope is where quotes silently diverge. Ceilings in or out. Closets in or out. Trim and doors included, or walls only. Garage door, garage interior, outbuildings, fences, the shed nobody looked at. Number of colors, since each additional color is another cut-in and another setup. Whether the crew is moving furniture or you are the night before. Every one of those is a real cost, and every one is a place where two bidders can both be completely honest and still be describing different jobs to you.
Build one short checklist and hand the same one to every bidder: which surfaces, how many colors, how many coats, what prep, what happens to areas that turn out worse than they looked, and what is explicitly excluded. When those answers come back on a page each, the differences stop being mysterious and the comparison becomes an actual comparison rather than a read on who sounded most confident. It also makes the follow-up conversation short, because for the first time everybody involved is looking at the same page and arguing about the same house.
There is nothing wrong with a low bid. Crew size, overhead, scheduling and how badly somebody wants the work all move a price legitimately. But a bid dramatically under the others is usually buying that gap somewhere, and there are only a few places to buy it: prep hours, coats, scope, or time spent on slow detail work like trim, edges and cut-in lines. Prep and coats are where the hours hide, which makes them the easiest hours in the business to remove without anybody noticing until well after the check clears.
So ask. Not accusingly, just plainly. What prep is in there, how many coats, which surfaces, and what happens if a wall needs more scraping than expected. Someone working to a genuinely lean number will tell you exactly what they are and are not doing, and occasionally that is the right trade for you. The bad outcome is not paying less. It is paying less without knowing what you bought. Working cheap is a legitimate strategy. Being unclear about what cheap bought you is a risk somebody else has decided you are taking.
Yes, and it does not have to be long. Surfaces included, surfaces excluded, prep steps, number of coats, number of colors, and how areas that turn out worse than expected get handled. That short list turns three unlike quotes into three comparable ones and gives everyone the same definition of finished, which is where most painting disputes actually start.
Not on its own. Two houses with identical measurements can need completely different amounts of scraping, sanding, caulking and priming, and prep is the biggest variable in the price. Square footage also ignores ceiling height, trim volume, color count, access and story count. Use it as a rough sanity check, never as the thing that picks the winner.
Six questions. What prep is included and on which surfaces. How many coats. Which surfaces are in scope and which are excluded. What happens where the existing finish has failed. How many colors are priced. And, on a home built before 1978, how they handle possible lead paint. Ask all six of everyone and the quotes become readable.
A paint job that fails early almost never fails everywhere at once. It fails at a particular edge, on a particular elevation, around a particular window, and if you look at…
Read the guide →Exterior painting has a season, and it is set by physics rather than by anybody's calendar. Coatings need to be applied and then to cure inside a range of temperature and…
Read the guide →Get quotes that price the prep, not just the color.
Request a QuoteTakes about a minute, or call 801-823-6018 and skip the typing.